Do you have any question about this t-code?
Transaction Code: S_AP9_75000010
Description: IMG Activity: APO_PPS_CDPSC3
Release: S/4HANA only
Program: SAPLS_CUS_IMG_ACTIVITY
Screen: 200
Authorization Object:
Development Package: APOC
Package Description: IMG/Customizing for APO
Parent Package: /SAPAPO/APO_STRUCTURE
Module/Component: SCM-APO-CA
Description: APO Cross-Application Components
Overview: S_AP9_75000010 is an SAP transaction code used to access the IMG Activity APO_PPS_CDPSC3. This activity is part of the Production Planning and Detailed Scheduling (PP/DS) component of the SAP Advanced Planning and Optimization (APO) module. Functionality: The IMG Activity APO_PPS_CDPSC3 allows users to define the settings for the Capacity Planning and Detailed Scheduling (CDPS) process in the PP/DS component of APO. This includes setting up the planning horizon, defining the scheduling parameters, and configuring the capacity requirements. Step-by-step How to Use: 1. Enter transaction code S_AP9_75000010 in the SAP command field. 2. Select IMG Activity APO_PPS_CDPSC3 from the list of activities. 3. Follow the instructions in each step to configure the settings for Capacity Planning and Detailed Scheduling. 4. Once all settings have been configured, save your changes and exit the activity. Other Recommendations: It is recommended that users familiarize themselves with the PP/DS component of APO before attempting to configure settings for Capacity Planning and Detailed Scheduling using transaction code S_AP9_75000010. Additionally, users should ensure that all settings are configured correctly before saving changes, as incorrect settings can lead to unexpected results in production planning and scheduling processes.
S_AP9_75000009 - IMG Activity: APO_PPS_CDPSC4...
S_AP9_75000008 - IMG Activity: APO_PPS_CDPSC5...
S_AP9_75000011 - IMG Activity: APO_PPS_CDPSC2...
S_AP9_75000012 - IMG Activity: APO_PPS_CDPSC1...