How to use S_ALR_87013364 - Planned Costs


SAP Transaction Code - Details

  • Transaction Code: S_ALR_87013364

    Description: Planned Costs

    Release: S/4HANA and ECC 6

  • Show technical details Hide technical details
    • Program:

      Screen: 0

      Authorization Object:

    • Development Package: RTTREE

      Package Description:

      Parent Package:

    • Module/Component:

      Description:


Smart SAP Assistant

  • SAP Tcode: S_ALR_87013364 - Planned Costs
    
    Overview: 
    S_ALR_87013364 is a SAP transaction code used to display planned costs. It is used to view the planned costs of a company’s operations, such as personnel costs, material costs, and overhead costs. 
    
    Functionality: 
    This transaction code allows users to view the planned costs of a company’s operations in a graphical format. It also allows users to compare the planned costs with actual costs and analyze the differences between them. Additionally, it can be used to identify areas where cost savings can be made. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code S_ALR_87013364 into the command field. 
    2. Select the company code for which you want to view the planned costs. 
    3. Select the period for which you want to view the planned costs. 
    4. Select the type of cost you want to view (personnel, material, overhead). 
    5. The system will display a graphical representation of the planned costs for that period. 
    6. To compare with actual costs, select “Compare with Actual Costs” from the menu bar. 
    7. The system will display a graphical representation of both the planned and actual costs for that period. 
    8. To identify areas where cost savings can be made, select “Analyze Differences” from the menu bar. 
    9. The system will display a graphical representation of any differences between the planned and actual costs for that period. 
    
    Other Recommendations: 
    It is recommended that users take advantage of this transaction code’s ability to compare and analyze differences between planned and actual costs in order to identify areas where cost savings can be made. Additionally, users should ensure that they are viewing up-to-date information by selecting an appropriate period when using this transaction code.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:

Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant