Do you have any question about this t-code?
Transaction Code: S_ALR_87011788
Description: Plan/Actual Comp. (COArea Currency)
Release: S/4HANA and ECC 6
Program:
Screen: 0
Authorization Object:
Development Package: RTTREE
Package Description:
Parent Package:
Module/Component:
Description:
Overview: S_ALR_87011788 is a SAP transaction code used to compare planned and actual costs in the Controlling (CO) area. It allows users to view the differences between the two values in the currency of the controlling area. Functionality: This transaction code enables users to compare planned and actual costs in the controlling area. It displays the differences between the two values in the currency of the controlling area. The comparison can be done for a single cost element or for multiple cost elements. The comparison can also be done for a single period or multiple periods. Step-by-step How to Use: 1. Enter S_ALR_87011788 into the SAP command field and press enter. 2. Select the Controlling Area from the drop-down menu. 3. Select either a single cost element or multiple cost elements from the list provided. 4. Select either a single period or multiple periods from the list provided. 5. Click “Execute” to view the comparison between planned and actual costs in the currency of the controlling area. Other Recommendations: It is recommended that users familiarize themselves with other SAP transaction codes related to cost planning and analysis, such as S_ALR_87011890 - Plan/Actual Comp.(CO Area/Currency) and S_ALR_87011891 - Plan/Actual Comp.(CO Area/Currency). These transaction codes provide additional functionality for comparing planned and actual costs in different currencies and controlling areas.
S_ALR_87011787 - Profit Center Report...
S_ALR_87011786 - Cost Element Report...
S_ALR_87011789 - Plan/Actual Comp. (CoCd Currency)...
S_ALR_87011790 - Automatic Currency Translation...