Do you have any question about this t-code?
Transaction Code: S_ALR_87000382
Description: IMG Activity: CFOKCMOKXB
Release: S/4HANA and ECC 6
Program: SAPLS_CUS_IMG_ACTIVITY
Screen: 200
Authorization Object:
Development Package: KC
Package Description: Cost Accounting Controlling EIS
Parent Package: APPL
Module/Component: EC-EIS-DCM
Description: Data Collection
Overview: S_ALR_87000382 is an SAP transaction code used to access the IMG Activity CFOKCMOKXB. This activity is part of the SAP Controlling (CO) module and is used to configure the cost center planning. Functionality: The S_ALR_87000382 transaction code allows users to configure the cost center planning in the SAP Controlling (CO) module. This includes setting up cost centers, assigning them to cost elements, and defining their planning parameters. It also allows users to define the planning methods for cost centers, such as budgeting, forecasting, and actuals. Step-by-step How to Use: 1. Enter the transaction code S_ALR_87000382 into the command field in SAP. 2. Select the IMG Activity CFOKCMOKXB from the list of activities. 3. Select the “Cost Center Planning” option from the menu on the left side of the screen. 4. Select “Define Cost Centers” from the menu on the right side of the screen. 5. Enter all necessary information for each cost center, such as name, description, and currency. 6. Select “Assign Cost Elements” from the menu on the right side of the screen. 7. Assign each cost center to its respective cost element(s). 8. Select “Define Planning Parameters” from the menu on the right side of the screen. 9. Enter all necessary information for each cost center’s planning parameters, such as budgeting method, forecasting method, and actuals method. 10. Save your changes and exit out of the transaction code S_ALR_87000382. Other Recommendations: It is recommended that users familiarize themselves with all aspects of cost center planning before using this transaction code in order to ensure that all settings are configured correctly and efficiently. Additionally, users should consult with their organization’s SAP experts if they have any questions or need assistance with configuring cost center planning in SAP Controlling (CO).
S_ALR_87000381 - IMG Activity: OLI0T370P...
S_ALR_87000379 - IMG Activity: SIMG_CFMENUOLMB001KL...
S_ALR_87000383 - IMG Activity: SIMG_CFMENUOLMBOMJ5...
S_ALR_87000385 - IMG Activity: SIMG_CFMENUOLI0OIR7...