How to use PK08 - Check Kanban Calculation Result


SAP Transaction Code - Details

  • Transaction Code: PK08

    Description: Check Kanban Calculation Result

    Release: S/4HANA and ECC 6

    Menu Path:

    • Information Systems > General Report Selection > Production Planning > KANBAN > Check Kanban Calculation Result
  • Show technical details Hide technical details
    • Program: SAPMMPKR

      Screen: 200

      Authorization Object:

    • Development Package: MD05

      Package Description: Kanban

      Parent Package: APPL

    • Module/Component: PP-KAB

      Description: KANBAN


Smart SAP Assistant

  • SAP Tcode: PK08 - Check Kanban Calculation Result
    
    Overview:
    PK08 is a transaction code used in SAP to check the calculation result of a Kanban. Kanban is a Japanese term for “visual signal” and is used in the manufacturing industry to control the production process. The PK08 transaction code allows users to view the calculation results of a Kanban, such as the number of Kanbans needed, the number of parts needed, and the total cost. 
    
    Functionality: 
    The PK08 transaction code allows users to view the calculation results of a Kanban. This includes the number of Kanbans needed, the number of parts needed, and the total cost. It also allows users to view the details of each Kanban, such as its size, type, and quantity. Additionally, users can view any errors that may have occurred during the calculation process. 
    
    Step-by-step How to Use: 
    1. Enter transaction code PK08 in the command field. 
    2. Enter the material number and plant for which you want to check the calculation result. 
    3. Select “Execute” to view the calculation result. 
    4. Select “Details” to view more information about each Kanban, such as its size, type, and quantity. 
    5. Select “Error Log” to view any errors that may have occurred during the calculation process. 
    6. Select “Back” to return to the main screen or “Cancel” to exit the transaction code. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with SAP terminology before using this transaction code. Additionally, users should ensure that they have all necessary information before attempting to use this transaction code, such as material numbers and plant codes. Finally, users should always check for errors after running this transaction code in order to ensure accuracy of results.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • PK07 - Kanban Calculation...

  • PK06 - PP Maintain Supply Area (Kanban)...

  • PK08N - Check Kanban Calculation Result...

  • PK09 - Unlock Kanban...


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker