How to use PK03NR - Display Control Cycle


SAP Transaction Code - Details

  • Transaction Code: PK03NR

    Description: Display Control Cycle

    Release: S/4HANA and ECC 6

  • Show technical details Hide technical details
    • Program: SAPMMPKR

      Screen: 102

      Authorization Object:

    • Development Package: MD05

      Package Description: Kanban

      Parent Package: APPL

    • Module/Component: PP-KAB

      Description: KANBAN


Smart SAP Assistant

  • SAP Tcode: PK03NR - Display Control Cycle
    
    Overview:
    PK03NR is a SAP transaction code used to display control cycle information in the SAP system. It is used to view the control cycle information for a particular cost center or cost element. 
    
    Functionality: 
    The PK03NR transaction code allows users to view the control cycle information for a particular cost center or cost element. This includes the start and end dates of the control cycle, as well as the frequency of the control cycle. The control cycle information can be used to determine when certain activities need to be completed in order to ensure that costs are accurately tracked and reported. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code PK03NR in the command field. 
    2. Enter the cost center or cost element for which you want to view the control cycle information. 
    3. Click on “Execute” to view the control cycle information for the selected cost center or cost element. 
    4. The start and end dates of the control cycle, as well as the frequency of the control cycle, will be displayed on the screen. 
    
    Other Recommendations: 
    It is important to note that the control cycle information displayed by this transaction code is only valid for the current fiscal year. If you need to view control cycle information for a different fiscal year, you will need to use a different transaction code (e.g., PK03N). Additionally, it is important to ensure that all activities related to cost tracking and reporting are completed within the specified control cycle period in order to ensure accurate reporting of costs.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • PK03 - Display Control Cycle...

  • PK02NR - Change Control Cycle...

  • PK05 - PP Maintain Supply Area (Kanban)...

  • PK05S - Fast Entry Supply Area...


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author