How to use OPDE - Resource planning control profile


SAP Transaction Code - Details

  • Transaction Code: OPDE

    Description: Resource planning control profile

    Release: S/4HANA and ECC 6

  • Show technical details Hide technical details
    • Program:

      Screen: 0

      Authorization Object:

    • Development Package: CY01

      Package Description: Application Development ERP Resource Planning

      Parent Package: APPL

    • Module/Component: PP-CRP-LVL

      Description: Capacity Leveling


Smart SAP Assistant

  • SAP Tcode: OPDE - Resource planning control profile
    
    Overview:
    The SAP transaction code OPDE is used to access the Resource Planning Control Profile. This profile is used to control the resource planning process in SAP. It allows users to define the parameters for resource planning, such as the number of resources, the duration of the planning period, and the type of resources to be planned. 
    
    Functionality: 
    The Resource Planning Control Profile is used to control the resource planning process in SAP. It allows users to define parameters such as the number of resources, the duration of the planning period, and the type of resources to be planned. The profile also allows users to set up rules for resource planning, such as how resources are allocated and how resources are managed. 
    
    Step-by-step How to Use: 
    To access the Resource Planning Control Profile, enter transaction code OPDE in the SAP command field. This will open up a window with several tabs. The first tab is for setting up general parameters for resource planning. Here, users can define the number of resources, the duration of the planning period, and the type of resources to be planned. The second tab is for setting up rules for resource planning. Here, users can define how resources are allocated and managed. The third tab is for setting up additional parameters for resource planning. Here, users can define additional parameters such as cost centers and cost elements. 
    
    Other Recommendations: 
    It is important to note that changes made in the Resource Planning Control Profile will affect all resource planning processes in SAP. Therefore, it is important to ensure that all changes made are correct and necessary before saving them. Additionally, it is recommended that users consult with their system administrator before making any changes in this profile.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • OPDD - Factory calendar...

  • OPDB - Capacity Leveling Strategy Profile...

  • OPDF - Define requirements grouping...

  • OPDH - Capacity leveling - list profile...


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant