Do you have any question about this t-code?
Transaction Code: OP80
Description: Maintain PRT Status
Release: S/4HANA and ECC 6
Program:
Screen: 0
Authorization Object:
Development Package: CF
Package Description: R/3 Appl. development: PPS production resources/tools
Parent Package: APPL
Module/Component: PP-BD-PRT
Description: Production Resources/Tools
Overview: OP80 is a transaction code used in SAP to maintain the status of PRT (Production Resources/Tools). It is used to manage the status of production resources and tools, such as machines, tools, and other equipment. This transaction code is used to set up and maintain the status of PRT in the system. Functionality: The OP80 transaction code allows users to maintain the status of PRT in the system. This includes setting up and maintaining the status of production resources and tools, such as machines, tools, and other equipment. The status of PRT can be set to active or inactive, depending on the user's needs. Additionally, users can also set up and maintain the status of PRT for specific plants or locations. Step-by-step How to Use: 1. Enter transaction code OP80 in the command field. 2. Select the plant or location for which you want to maintain the status of PRT. 3. Select the PRT for which you want to maintain the status. 4. Select the desired status (active or inactive) for the selected PRT. 5. Save your changes. Other Recommendations: It is important to note that when setting up and maintaining the status of PRT, users should ensure that all relevant information is entered correctly and accurately. Additionally, users should also ensure that all changes are saved before exiting the transaction code.