Do you have any question about this t-code?
Transaction Code: OIZ5
Description: Operation Control Keys
Release: S/4HANA and ECC 6
Program:
Screen: 0
Authorization Object:
Development Package: INSC
Package Description: Application Development R/3 Plant Maintenance Customizing
Parent Package: APPL
Module/Component: PM
Description: Plant Maintenance
Overview: The SAP transaction code OIZ5 is used to maintain the control keys for operations in the production order. It is used to define the control keys for operations in the production order, which are used to control the scheduling and costing of operations. Functionality: The OIZ5 transaction code allows users to define control keys for operations in the production order. These control keys are used to control the scheduling and costing of operations. The control keys can be used to define the scheduling parameters, such as start and finish dates, as well as the costing parameters, such as material costs and labor costs. Step-by-step How to Use: 1. Enter the transaction code OIZ5 in the command field. 2. Select the operation for which you want to define a control key. 3. Select the control key that you want to assign to the operation. 4. Enter any additional information that is required for the control key, such as start and finish dates or material costs and labor costs. 5. Save your changes. Other Recommendations: It is important to note that different control keys can be assigned to different operations in a production order, depending on their specific requirements. Additionally, it is important to ensure that all of the necessary information is entered correctly when defining a control key, as this will ensure that the operation is scheduled and costed correctly.