How to use MDSP - Maintain BOM Explosion Numbers


SAP Transaction Code - Details

  • Transaction Code: MDSP

    Description: Maintain BOM Explosion Numbers

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Materials Management > Material Requirements Planning (MRP) > MRP > Master Data > BOM Explosion Number > Edit
    • Logistics > Production > Production Planning > MPS > Master Data > BOM Explosion Number > Maintain
    • Logistics > Production > MRP > Master Data > BOM Explosion Numbers > Edit
    • Logistics > Production - Process > Production Planning > MPS > Master Data > BOM Explosion Number > Maintain
    • Logistics > Production - Process > MRP > Master Data > BOM Explosion Numbers > Edit
  • Show technical details Hide technical details
    • Program: SAPMM61S

      Screen: 200

      Authorization Object:

    • Development Package: MD03

      Package Description: Application Devt ERP MPS/Deterministic Requirements Planning

      Parent Package: APPL

    • Module/Component: PP-MRP-BD

      Description: Master Data


Smart SAP Assistant

  • SAP Tcode: MDSP - Maintain BOM Explosion Numbers
    
    Overview: 
    The SAP transaction code MDSP is used to maintain the explosion numbers of a bill of materials (BOM). This transaction code allows users to assign a unique number to each component of a BOM, which can then be used to track the components and their associated costs. 
    
    Functionality: 
    The MDSP transaction code allows users to assign explosion numbers to each component of a BOM. This enables users to track the components and their associated costs more easily. The explosion numbers are also used in the production process, as they are used to identify the components that need to be assembled in order to create the finished product. 
    
    Step-by-step How to Use: 
    1. Enter the MDSP transaction code into the SAP system. 
    2. Select the BOM that you want to assign explosion numbers to. 
    3. Enter the explosion number for each component of the BOM. 
    4. Save your changes. 
    
    Other Recommendations: 
    It is important to ensure that all components of a BOM have unique explosion numbers, as this will help ensure that all components are tracked correctly and that no components are missed during production. Additionally, it is important to keep track of any changes made to the BOM, as this will help ensure that all components are up-to-date and accurate.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:

Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker