Do you have any question about this t-code?
Transaction Code: MC8A
Description: Create Planning Type
Release: S/4HANA and ECC 6
Menu Path:
Program: SAPMMCP6
Screen: 700
Authorization Object:
Development Package: MCP2
Package Description: R/3 application development: Sales & Operations Planning
Parent Package: APPL
Module/Component: PP-SOP-SP
Description: Sales Plan
Overview: The SAP transaction code MC8A is used to create a planning type in the SAP system. This planning type is used to define the characteristics of a material requirement planning (MRP) run. It is used to control the parameters of the MRP run, such as the scheduling parameters, lot size, and safety stock. Functionality: The MC8A transaction code allows users to create a planning type in the SAP system. This planning type is used to define the characteristics of a material requirement planning (MRP) run. It is used to control the parameters of the MRP run, such as the scheduling parameters, lot size, and safety stock. The planning type also defines how the MRP run will be executed and what data will be used for the calculation. Step-by-Step How to Use 1. Enter transaction code MC8A in the command field. 2. Enter a name for the planning type in the Planning Type field. 3. Enter a description for the planning type in the Description field. 4. Select a scheduling parameter from the drop-down list in the Scheduling Parameter field. 5. Select a lot size from the drop-down list in the Lot Size field. 6. Enter a value for safety stock in the Safety Stock field. 7. Select an MRP type from the drop-down list in the MRP Type field. 8. Select an MRP controller from the drop-down list in the MRP Controller field. 9. Select an MRP area from the drop-down list in the MRP Area field. 10. Click on Save to save your changes and create your new planning type. Other Recommendations: It is recommended that users familiarize themselves with all of the parameters available when creating a planning type using transaction code MC8A before creating one in their system, as this will ensure that they are able to create a planning type that meets their needs and requirements accurately and efficiently. Additionally, users should ensure that they have all of their data ready before creating a new planning type, as this will help them to avoid any potential errors or delays when creating it in their system.