GRM2 - Display MRP Group Assignments


SAP Transaction Code - Details

  • Transaction Code: GRM2

    Description: Display MRP Group Assignments

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Project System > Material > Planning > Requirements Grouping > Display Assigned MRP Groups
    • Accounting > Project System > Material > Planning > Requirements Grouping > Display Assigned MRP Groups
  • Show technical details Hide technical details
    • Program: SAPMGR02

      Screen: 100

      Authorization Object:

    • Development Package: GRPG

      Package Description: Grouping/Pegging for Individual Project Planning

      Parent Package: APPL

    • Module/Component: PS-MAT

      Description: Material


Smart SAP Assistant

  • SAP Tcode: GRM2 - Display MRP Group Assignments
    
    Overview: 
    GRM2 is a transaction code used in SAP to display MRP group assignments. It is used to view the material requirements planning (MRP) groups that are assigned to a material. This transaction code is part of the Logistics - Materials Management module. 
    
    Functionality: 
    GRM2 allows users to view the MRP groups that are assigned to a material. This information can be used to determine which materials are included in the MRP group and which materials are excluded from it. It also allows users to view the MRP parameters that are associated with the MRP group, such as the planning horizon, lot size, and safety stock. 
    
    Step-by-step How to Use: 
    1. Enter GRM2 in the SAP command field and press enter. 
    2. Enter the material number for which you want to view the MRP group assignments. 
    3. Select the “Display” button to view the MRP group assignments for the material. 
    4. Select the “Change” button to make changes to the MRP group assignments for the material. 
    5. Select the “Save” button to save any changes made to the MRP group assignments for the material. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with all of the parameters associated with an MRP group before making any changes to it. Additionally, users should ensure that they have appropriate authorization before making any changes to an MRP group assignment.
    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic T-Code Explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • GRM1 - Display Grouping WBS Elem Assign....

  • GRLV - List variants for line items...

  • GRM3 - Colective Processing: Assignments...

  • GRM4 - Change Grouping Element Assignments...


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant