Do you have any question about this t-code?
Transaction Code: GMAVCDERICH
Description: GM Derivation of check horizon
Release: S/4HANA and ECC 6
Program:
Screen: 0
Authorization Object:
Development Package: GMBUDGETING_E
Package Description: Grants management (budgeting)
Parent Package: GRANTEE_MANAGEMENT
Module/Component: PSM-GM-GTE-BU
Description: Budgeting and Availability Control
Overview: GMAVCDERICH is an SAP transaction code used to derive the check horizon for a given material. It is used to determine the validity period of a material in the system. This transaction code is part of the SAP Materials Management (MM) module. Functionality: GMAVCDERICH allows users to determine the validity period of a material in the system. This transaction code can be used to check the validity of a material and to ensure that it is valid for use in the system. It also allows users to set up a check horizon for a given material, which can be used to determine when the material should be checked for validity. Step-by-step How to Use: 1. Enter GMAVCDERICH into the SAP command field and press enter. 2. Enter the material number into the Material field and press enter. 3. Enter the date range for which you want to check the validity of the material into the Date Range field and press enter. 4. The system will display a list of valid materials within the specified date range. 5. Select the desired material from the list and press enter. 6. The system will display a list of valid materials within the specified date range, along with their check horizons. 7. Select the desired material from the list and press enter to view its check horizon details. 8. The system will display information about the check horizon, such as its start date, end date, and duration. 9. Press enter to save your changes and exit out of the transaction code. Other Recommendations: It is important to note that GMAVCDERICH should only be used when necessary, as it can be time consuming and resource intensive if used too often or unnecessarily. Additionally, it is important to ensure that all materials are valid before using them in any process or operation in order to avoid any potential issues or errors that may arise from using an invalid material in a process or operation.
GMAVCDERIAOR - GM Derivation control object (ACO)...
GMAVCDERIAO - GM Derivation control object (ACO)...
GMAVCDERICHR - GM Derivation of check horizon...
GMAVCDERITPROF - GM Derivation of tolerance profile...