How to use FINS_ALLOC_PC_AB - PC Alloc: Execute pla. overhead cyc.


SAP Transaction Code - Details

  • Transaction Code: FINS_ALLOC_PC_AB

    Description: PC Alloc: Execute pla. overhead cyc.

    Release: S/4HANA and ECC 6

  • Show technical details Hide technical details
    • Program: SAPMKGA2

      Screen: 102

      Authorization Object:

    • Development Package: FINS_ONE_ALLOCATION

      Package Description: One Allocation

      Parent Package: APPL_FIN_ACC

    • Module/Component: FI-GL

      Description: General Ledger Accounting


Smart SAP Assistant

  • SAP Tcode: FINS_ALLOC_PC_AB - PC Alloc: Execute pla. overhead cyc.
    
    Overview:
    The SAP transaction code FINS_ALLOC_PC_AB - PC Alloc Execute pla. overhead cyc. is used to execute the planned overhead cycle in the Controlling (CO) module of the SAP system. This transaction code is used to allocate overhead costs to cost centers and orders. 
    
    Functionality: 
    The FINS_ALLOC_PC_AB - PC Alloc Execute pla. overhead cyc. transaction code allows users to execute the planned overhead cycle in the Controlling (CO) module of the SAP system. This transaction code is used to allocate overhead costs to cost centers and orders. The planned overhead cycle is used to calculate and distribute overhead costs based on a predetermined plan. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code FINS_ALLOC_PC_AB - PC Alloc Execute pla. overhead cyc. into the command field of the SAP system. 
    2. Select the “Execute” button to start the planned overhead cycle. 
    3. The system will display a list of cost centers and orders that will be affected by the planned overhead cycle. 
    4. Select the “Execute” button again to start the planned overhead cycle for these cost centers and orders. 
    5. The system will display a confirmation message when the planned overhead cycle has been successfully executed for these cost centers and orders. 
    
    Other Recommendations: 
    It is recommended that users check the results of the planned overhead cycle before saving them in order to ensure that all costs have been allocated correctly. Additionally, users should also check that all cost centers and orders have been included in the planned overhead cycle before executing it.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:

Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker