Do you have any question about this t-code?
Transaction Code: CR25
Description: Change Resource Network
Release: S/4HANA and ECC 6
Menu Path:
Program: SAPLCR06
Screen: 109
Authorization Object: C_ARPL_WRK
Development Package: CRC
Package Description: R/3 Application Development: PP Recipe-Specific Resources
Parent Package: APPL
Module/Component: PP-PI-MD-RSC
Description: Resources
Overview: The SAP transaction code CR25 is used to change the resource network in the SAP system. It is used to modify the existing resource network and to create new resource networks. This transaction code is used in the SAP Project System (PS) module. Functionality: CR25 allows users to create, change, and delete resource networks. It also allows users to assign resources to a network and to assign activities to a network. The resource network can be used for scheduling and controlling activities in a project. Step-by-step How to Use: 1. Enter the transaction code CR25 in the command field. 2. Select the project for which you want to create or change a resource network. 3. Select the type of resource network you want to create or change (e.g., activity-oriented, resource-oriented, etc.). 4. Enter the details of the resource network (e.g., name, description, etc.). 5. Assign resources and activities to the resource network as required. 6. Save your changes and exit the transaction code. Other Recommendations: It is recommended that users familiarize themselves with the different types of resource networks before using this transaction code. Additionally, users should ensure that they have sufficient authorization before using this transaction code as it can be used to make changes to existing resource networks and create new ones.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic T-Code Explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |