CN50 - Overview: Capacity Requirements


SAP Transaction Code - Details

  • Transaction Code: CN50

    Description: Overview: Capacity Requirements

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Project System > Information System > Structures > Enhanced Individual Overviews > Capacity Requirements
    • Accounting > Project System > Information System > Structures > Enhanced Individual Overviews > Capacity Requirements
    • Information Systems > Project System > Structures > Enhanced Individual Overviews > Capacity Requirements
    • Information Systems > General Report Selection > Project System > Structures > Enhanced Individual Overviews > Capacity Requirements
  • Show technical details Hide technical details
    • Program: RCNKB000

      Screen: 1000

      Authorization Object: C_PROJ_TCD

    • Development Package: CNIS

      Package Description: Application development R/3 PS information system

      Parent Package: APPL

    • Module/Component: PS-IS

      Description: Information System


Smart SAP Assistant

  • SAP Tcode: CN50 - Overview: Capacity Requirements
     Planning
    
    Overview: 
    CN50 is a transaction code used in SAP to access the Capacity Requirements Planning (CRP) module. This module is used to plan and manage capacity requirements for production orders and process orders. It helps to ensure that the capacity of the production system is used efficiently and that production orders are completed on time. 
    
    Functionality: 
    The CRP module allows users to view and analyze capacity requirements for production orders and process orders. It also provides tools for creating and managing capacity plans, as well as for monitoring and controlling capacity utilization. The CRP module can be used to identify potential bottlenecks in the production system, as well as to optimize the use of resources. 
    
    Step-by-step How to Use: 
    1. Access the CRP module by entering transaction code CN50 in the SAP command field. 
    2. Select the relevant order type (production or process) from the drop-down menu. 
    3. Enter the relevant order number in the Order Number field. 
    4. Select the relevant date range from the Date Range field. 
    5. Click on “Display” to view the capacity requirements for the selected order type and order number within the specified date range. 
    6. To create a capacity plan, click on “Create Plan” and enter the relevant details in the fields provided. 
    7. To monitor and control capacity utilization, click on “Monitor/Control” and select the relevant options from the drop-down menu. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with all of the features of the CRP module before using it, as this will help them to make better use of its capabilities. Additionally, users should ensure that they are aware of any changes or updates to the CRP module, as these may affect their ability to use it effectively.
    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic T-Code Explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • CN49N - Overview: Relationships...

  • CN49 - Overview: Relationships...

  • CN50N - Overview: Capacity Requirements...

  • CN51 - Overview: PRTs...


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker