Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How to use CC12 - Change Material Revision Level


CC12 - Overview

  • Transaction Code: CC12

    Description: Change Material Revision Level

    Release: S/4HANA and ECC 6

    Menu Path:

    • Cross-Application Components > Engineering Change Management > Revision Level > Material Revision Level > Change
    • Logistics > Production > Master Data > Engineering Change Management > Revision Level > Material Revision Level > Change
    • Logistics > Production - Process > Master Data > Engineering Change Management > Revision Level > Material Revision Level > Change
    • Logistics > Plant Maintenance > Management of Technical Objects > Environment > Engineering Change Management > Revision Level > Material Revision Level > Change
    • Logistics > Customer Service > Management of Technical Objects > Environment > Engineering Change Management > Revision Level > Material Revision Level > Change
    • Logistics > Central Functions > Variant Configuration > Environment > Engineering Change Management > Revision Level > Material Revision Level > Change
    • Logistics > Central Functions > Document Management System > Environment > Engineering Change Management > Revision Level > Material Revision Level > Change
    • Logistics > Central Functions > Engineering > Engineering Change Management > Revision Level > Material Revision Level > Change
  • Show technical details Hide technical details
    • Program: SAPLCCIN

      Screen: 1000

      Authorization Object: C_AENR_RV1

    • Development Package: CC

      Package Description: Engineering Change Management

      Parent Package: ABA_MAIN_PLM

    • Module/Component: CA-GTF-ECM

      Description: Engineering Change Management


CC12 - Details

  • SAP Tcode: CC12 - Change Material Revision Level

    Transaction Code: CC12

    Description: Change Material Revision Level

    Overview: CC12 is used to change the revision level of a material in SAP, allowing users to update or correct the revision status assigned to a material master record.

    Key Use Cases:

    • Updating the revision level of a material after engineering changes or product updates
    • Correcting an incorrectly assigned revision level in the material master
    • Managing product lifecycle by tracking different versions or revisions of a material
    • Ensuring that production and procurement use the correct material revision for quality and compliance

    Already have an account? Login here!

CC12 - Related Tcodes

  • CC11 - Create Material Revision Level...

  • CC07 - Engineering Change Mgmt information...

  • CC13 - Display Material Revision Level...

  • CC15 - Change Document Revision Level...


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author