Do you have any question about this t-code?
Transaction Code: S_E38_98000088
Description: PC-Gruppe: Plan-/Istabweichung
Release: S/4HANA and ECC 6
Menu Path:
Program:
Screen: 0
Authorization Object:
Development Package: FAGL_REPORTING_EHP3_SFWC_UI
Package Description: Reporting GL: UI Elements Switched
Parent Package: FINA_GL
Module/Component: FI-GL
Description: General Ledger Accounting
Analysis Overview: S_E38_98000088 is a SAP transaction code used to analyze the variance between planned and actual costs for a cost center group. This transaction code is used to compare the planned and actual costs of a cost center group in order to identify any discrepancies. Functionality: The S_E38_98000088 transaction code allows users to compare the planned and actual costs of a cost center group. It provides an overview of the total planned and actual costs, as well as the variance between them. The transaction code also allows users to drill down into the details of each cost center in order to identify any discrepancies. Step-by-step How to Use: 1. Enter the S_E38_98000088 transaction code into the SAP system. 2. Select the cost center group you wish to analyze. 3. Select the period you wish to analyze. 4. Select the type of analysis you wish to perform (e.g., planned vs actual). 5. The system will display an overview of the total planned and actual costs, as well as the variance between them. 6. To drill down into the details of each cost center, select “Drilldown” from the menu bar. 7. The system will display a detailed breakdown of each cost center in the selected period, including planned and actual costs, as well as any variances between them. 8. To view a graphical representation of the data, select “Graph” from the menu bar. 9. The system will display a graphical representation of the data, allowing users to quickly identify any discrepancies between planned and actual costs for each cost center in the selected period. Other Recommendations: It is recommended that users regularly analyze their cost centers using this transaction code in order to identify any discrepancies between planned and actual costs and take corrective action if necessary. Additionally, users should ensure that they are using up-to-date data when performing their analysis in order to ensure accuracy of results.
S_E38_98000074 - ...
S_E38_98000073 - ...
S_E38_98000089 - PC-Gruppe: Plan/Plan/Ist...
S_E38_98000090 - PC-Gruppe Kennzahlen...