How to use MD01 - MRP-Planungslauf


SAP Transaction Code - Details

  • Transaction Code: MD01

    Description: MRP-Planungslauf

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Materials Management > Material Requirements Planning (MRP) > MRP > Planning > Total Planning > Online
    • Logistics > Production > MRP > Planning > Total Planning > Online
    • Logistics > Production - Process > MRP > Planning > Total Planning > Online
  • Show technical details Hide technical details
    • Program: SAPMM61X

      Screen: 100

      Authorization Object:

    • Development Package: MD

      Package Description: Application Development R/3 Material Requirements Planning

      Parent Package: APPL

    • Module/Component: PP-MRP-BD

      Description: Master Data


Smart SAP Assistant

  • SAP Tcode: MD01 - MRP-Planungslauf
    
    Overview:
    The SAP transaction code MD01 is used to run the Material Requirements Planning (MRP) process. This process is used to calculate the necessary material requirements for a given production plan. It takes into account the current stock levels, planned orders, and forecasted demand in order to determine the optimal material requirements for a given production plan. 
    
    Functionality: 
    The MD01 transaction code is used to initiate the MRP process. It allows users to define the scope of the MRP run, such as the plant, material group, and MRP area. It also allows users to specify the planning parameters, such as the planning horizon and lot size. Once these parameters are set, the MRP run can be initiated. 
    
    Step-by-step How to Use: 
    1. Enter transaction code MD01 in the command field. 
    2. Select the plant and material group for which you want to run the MRP process. 
    3. Select the MRP area for which you want to run the MRP process. 
    4. Set the planning parameters such as planning horizon and lot size. 
    5. Click on “Execute” to initiate the MRP run. 
    6. The results of the MRP run will be displayed in a table format. 
    7. Review and analyze the results of the MRP run and take necessary action accordingly. 
    
    Other Recommendations: 
    It is recommended that users review and analyze the results of an MRP run before taking any action based on it. Additionally, users should ensure that all relevant data is up-to-date before running an MRP process, as this will ensure that accurate results are obtained from it.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • MD00 - MRP: Fremdbeschaffung...

  • MCZ3 - LIS-Eingangsschnittstelle anzeigen...

  • MD01N - MRP Live...

  • MD02 - MRP-Einzelplanung -mehrstufig-...


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author