1. SAP Glossary
  2. Container Shipping Line
  3. cut-off


What is cut-off in SAP TM-ADP-CSL - Container Shipping Line?


SAP Term: cut-off


Smart SAP Assistant

  • Key Concepts: 
    Cut-off is a term used in the Container Shipping Line (CSL) component of SAP Transportation Management (TM). It is the time limit for when a shipment must be loaded onto a vessel in order to be included in the voyage. Cut-off times are typically set by the shipping line and are based on the vessel's departure time.
    
    How to use it: 
    In SAP TM, cut-off times are used to determine when a shipment must be loaded onto a vessel in order to be included in the voyage. Cut-off times can be set manually or automatically, depending on the shipping line's preferences. When setting cut-off times manually, users must enter the desired cut-off time into the system. When setting cut-off times automatically, users must select the desired cut-off time from a list of available options.
    
    Tips & Tricks: 
    It is important to remember that cut-off times are based on the vessel's departure time, so it is important to ensure that all shipments are loaded onto the vessel before the cut-off time in order to be included in the voyage. Additionally, it is important to note that cut-off times may vary depending on the shipping line and vessel type.
    
    Related Information: 
    For more information about cut-off times and how they are used in SAP TM, please refer to SAP Help documentation or contact your local SAP support team.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker