1. SAP Glossary
  2. Network & Operations for Container Shipping Liners
  3. berthing terms


What is berthing terms in SAP TM-ADP-CSL-NAO - Network & Operations for Container Shipping Liners?


SAP Term: berthing terms

  • Component: TM-ADP-CSL-NAO

  • Component Name: Network & Operations for Container Shipping Liners

  • Description: The conditions of carriage whereby the cargo is shipped under a rate that includes all costs from the end of the port call operations at the port of loading to the end of the port call operations at the port of discharge. The costs for loading and unloading the cargo are borne by the carrier.


Smart SAP Assistant

  • Key Concepts: 
    Berthing terms are the conditions and regulations that govern the arrival and departure of vessels at a port. In the SAP TM-ADP-CSL-NAO Network & Operations for Container Shipping Liners component, berthing terms are used to define the rules for vessel arrival and departure, such as the time window for berthing and unberthing, the number of vessels that can be berthed at a port, and the order in which vessels will be berthed. 
    
    How to use it: 
    Berthing terms can be configured in the SAP TM-ADP-CSL-NAO Network & Operations for Container Shipping Liners component. The user can define the rules for vessel arrival and departure, such as the time window for berthing and unberthing, the number of vessels that can be berthed at a port, and the order in which vessels will be berthed. The user can also specify any additional conditions or regulations that need to be met in order for a vessel to berth or unberth. 
    
    Tips & Tricks: 
    When configuring berthing terms in SAP TM-ADP-CSL-NAO Network & Operations for Container Shipping Liners, it is important to consider any additional conditions or regulations that may need to be met in order for a vessel to berth or unberth. This could include restrictions on vessel size, type, or cargo. It is also important to consider any local regulations or laws that may apply to berthing operations. 
    
    Related Information: 
    For more information on configuring berthing terms in SAP TM-ADP-CSL-NAO Network & Operations for Container Shipping Liners, please refer to the official SAP documentation. Additionally, there are many online resources available that provide detailed information on berthing terms and regulations.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant