Do you have any question about this SAP term?
Component: SRD-SCM-SCP
Component Name: SCM-Supply Chain Planning and Control
Description: A time phased schedule of plans to acquire materials that will thus be available to satisfy anticipated or actual customer demand. Acquisition of material will normally be by production, but could also be by procurement.
Key Concepts: A master schedule is a tool used in SAP Supply Chain Planning and Control (SCM-SCP) to plan and manage the production of goods. It is a long-term plan that outlines the production process, from raw materials to finished products. The master schedule is used to determine the quantity and timing of production, as well as the resources needed to complete the process. How to use it: The master schedule is created by entering the desired production quantities and dates into the SAP system. The system then calculates the necessary resources and materials needed for each step of the production process. The master schedule can be adjusted as needed to accommodate changes in demand or supply. Tips & Tricks: When creating a master schedule, it is important to consider both short-term and long-term needs. Short-term needs should be addressed first, as they are more likely to change quickly. Long-term needs should be planned for in advance, as they are more likely to remain constant over time. Related Information: The master schedule is closely related to other SAP SCM-SCP tools such as material requirements planning (MRP) and capacity requirements planning (CRP). MRP is used to determine the quantity of materials needed for production, while CRP is used to determine the capacity of resources needed for production. Together, these tools help ensure that production runs smoothly and efficiently.