Do you have any question about this SAP term?
Component: SRD-SCM-MD
Component Name: SCM-Master Data
Description: The period in which a production bill of material BoM and production segment structure is in a stable state and does not change, for a selected explosion date in released planning and execution models.
Key Concepts: RPM (Replenishment Planning Method) is a tool used in SAP SCM-Master Data to determine the optimal order quantity for a given item. It takes into account the current stock level, the lead time for replenishment, and the desired service level. The “unchanged from/to” setting allows the user to specify a range of values for which the RPM will remain unchanged. How to use it: To use RPM unchanged from/to, first select the item you want to set up replenishment planning for. Then, enter the desired service level and lead time for replenishment. Finally, enter the range of values for which you want the RPM to remain unchanged. This will ensure that the order quantity remains consistent within this range. Tips & Tricks: When setting up RPM unchanged from/to, it is important to consider the current stock level and desired service level. If the current stock level is too low or the desired service level is too high, then it may be necessary to adjust the range of values accordingly. Related Information: For more information on using RPM in SAP SCM-Master Data, please refer to SAP’s official documentation on Replenishment Planning Methods.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP Glossary term explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |