Do you have any question about this SAP term?
Component: SRD-SCM-MD
Component Name: SCM-Master Data
Description: The display of all the input products used either directly or indirectly in a parent, including the quantity of each input product required. The system displays all the input products for subassemblies and intermediates, and continues down through the input product structure to the level of purchased parts and raw materials.
Key Concepts: A multi-level bill of material (BOM) is a hierarchical structure of components used to define the assembly of a product. It is used in SAP's Supply Chain Management (SCM) module to define the components and sub-components that make up a product. The BOM can be used to track the cost of each component, as well as the total cost of the product. How to use it: In SAP SCM, a multi-level BOM is created by defining the components and sub-components that make up a product. The BOM can then be used to track the cost of each component, as well as the total cost of the product. The BOM can also be used to generate reports on the cost of each component and the total cost of the product. Tips & Tricks: When creating a multi-level BOM in SAP SCM, it is important to ensure that all components and sub-components are accurately defined. This will ensure that accurate cost reports can be generated. Additionally, it is important to ensure that all components and sub-components are correctly linked in order for the BOM to accurately reflect the structure of the product. Related Information: For more information on multi-level BOMs in SAP SCM, please refer to SAP's official documentation on the topic: https://help.sap.com/viewer/product/SAP_SCM/7.5/en-US/f8d9f3a2b6c14e8a9f3d7c2b1e4d7f2a.html