Do you have any question about this SAP term?
Component: SCM-APO-PPS
Component Name: Production Planning and Detailed Scheduling
Description: Property of a quantity denoting that it is relevant to the net requirement calculation and to dynamic pegging. The net requirement calculation and dynamic pegging take the pegging-relevant quantity of a receipt or a requirement into account: The net requirement calculation offsets pegging-relevant requirements with pegging-relevant receipts, while dynamic pegging assigns pegging-relevant receipts to pegging-relevant requirements.
Key Concepts: Relevant for pegging is a feature of the Production Planning and Detailed Scheduling (PPS) component of SAP's Supply Chain Management (SCM) application. It allows users to identify and track the source of supply for a particular material or product. This helps to ensure that the right materials are available at the right time and in the right quantities. How to use it: Relevant for pegging can be used to identify and track the source of supply for a particular material or product. This is done by creating a pegging structure, which is a hierarchical representation of the supply chain. The pegging structure can be used to identify the source of supply for each material or product, as well as to track changes in the supply chain over time. Tips & Tricks: When creating a pegging structure, it is important to ensure that all relevant information is included. This includes information about suppliers, production sites, and other elements of the supply chain. Additionally, it is important to keep the pegging structure up-to-date in order to ensure that it accurately reflects changes in the supply chain. Related Information: The PPS component of SAP's SCM application also includes features such as demand planning, capacity planning, and material requirements planning (MRP). These features can be used in conjunction with relevant for pegging to ensure that materials are available when needed and in the right quantities.