1. SAP Glossary
  2. Production Planning and Detailed Scheduling
  3. pegging structure


What is pegging structure in SAP SCM-APO-PPS - Production Planning and Detailed Scheduling?


SAP Term: pegging structure

  • Component: SCM-APO-PPS

  • Component Name: Production Planning and Detailed Scheduling

  • Description: Structure that describes the material flows between product receipts purchase orders, purchase requisitions, planned orders, production orders and stocks and product requirements sales orders, planned independent requirements, dependent requirements and stock transport requirements. The pegging structure describes the relationships of orders at all BOM levels, and for sales orders from the receipt elements of the ordered products and the required components, to the receipt elements for the raw materials. A material flow is possible between two orders, that is, a pegging relationship can be created between orders If the orders are in the same pegging area, for example, if the product, location, account assignment and planning version of the orders are the same If the product receipt is before the product requirement If this is not the case, the pegging relationship cannot be created and/or an alert will be created. The exact behavior is dependent on


Smart SAP Assistant

  • Key Concepts: 
    A pegging structure is a graphical representation of the relationships between different components of a production plan. It is used to visualize the dependencies between different components, such as materials, operations, and resources. It is also used to identify potential bottlenecks and optimize the production process. 
    
    How to use it: 
    In SAP SCM-APO-PPS Production Planning and Detailed Scheduling, pegging structures are used to create a visual representation of the production plan. This helps to identify potential bottlenecks and optimize the production process. The pegging structure can be used to analyze the relationships between different components, such as materials, operations, and resources. 
    
    Tips & Tricks: 
    When creating a pegging structure in SAP SCM-APO-PPS Production Planning and Detailed Scheduling, it is important to ensure that all components are correctly linked. This will help to ensure that the production plan is optimized and that potential bottlenecks are identified. 
    
    Related Information: 
    For more information on pegging structures in SAP SCM-APO-PPS Production Planning and Detailed Scheduling, please refer to the official SAP documentation.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker