Do you have any question about this SAP term?
Component: QM
Component Name: Quality Management
Description: Series of values for the control variable in a control chart that lie either above or below the center line. The check for runs is a stability test that is covered by Western Electric Rules.
Key Concepts: Run is a term used in SAP Quality Management (QM) to refer to a specific process or task. It is used to describe the execution of a quality inspection or test, and can also refer to the results of that inspection or test. How to use it: In SAP QM, a run is created when an inspection lot is created. The run will contain all the information related to the inspection lot, such as the material, quantity, and inspection characteristics. The run will also contain the results of the inspection or test, such as any defects found or measurements taken. Tips & Tricks: When creating a run in SAP QM, it is important to ensure that all relevant information is included. This includes the material, quantity, and inspection characteristics, as well as any additional information that may be required for the specific inspection or test. Related Information: In SAP QM, runs can be used to track the progress of an inspection lot over time. This can be done by viewing the status of each run in the Quality Inspection Monitor (QIM). Additionally, runs can be used to generate reports on the results of an inspection or test.