Do you have any question about this SAP term?
Component: QM
Component Name: Quality Management
Description: A master data record that contains the definition of inspection stages and conditions that lead to inspection stage changes. In the Quality Inspection Engine QIE, the dynamic modification rule also contains the time of dynamic modification. The stage changes depend on the inspection results for inspection lots and inspection characteristics and in the QIE, the stage changes depend on the inspection results for inspection documents, that is, they depend on whether the inspection documents are accepted or rejected or on the basis of other stage changes specified in the dynamic modification rule.
Key Concepts: Dynamic modification rules in SAP Quality Management (QM) are used to automatically adjust inspection plans based on the characteristics of the material being inspected. This allows for more efficient and accurate quality control, as the inspection plan can be tailored to the specific material being inspected. How to use it: Dynamic modification rules are set up in the QM system and can be used to adjust the inspection plan for a particular material. The rules can be set up to adjust the sampling rate, inspection characteristics, and other parameters of the inspection plan. The rules can also be used to trigger additional inspections or tests if certain criteria are met. Tips & Tricks: When setting up dynamic modification rules, it is important to consider the characteristics of the material being inspected and how they may affect the inspection plan. It is also important to consider any additional tests or inspections that may need to be triggered based on certain criteria. Related Information: For more information on dynamic modification rules in SAP Quality Management, please refer to SAP Help documentation or contact your local SAP support team.