What is work scheduler group in SAP PP - Production Planning and Control?


SAP Term: work scheduler group

  • Component: PP

  • Component Name: Production Planning and Control

  • Description: A key that is used to differentiate between the departments responsible for planning, such as work scheduling, or inspection planning. For example, these groups can be responsible for processing specific materials, orders, or routings.


Smart SAP Assistant

  • Key Concepts: 
    Work Scheduler Group is a component of SAP Production Planning and Control (PP) that allows users to define and manage the scheduling of production orders. It enables users to define the sequence of operations for each production order, as well as the resources and materials needed for each operation. The Work Scheduler Group also allows users to set up rules for scheduling production orders, such as the order in which operations should be performed, the duration of each operation, and the availability of resources and materials.
    
    How to use it: 
    To use the Work Scheduler Group, users must first define a work schedule group in the system. This can be done by entering the name of the group, a description, and any other relevant information. Once the group is defined, users can then assign production orders to it. This is done by selecting the production order in the system and then assigning it to the work schedule group. Once assigned, users can then define the sequence of operations for each production order, as well as any other relevant information such as resources and materials needed for each operation. 
    
    Tips & Tricks: 
    When setting up a work schedule group, it is important to consider how long each operation will take and what resources and materials will be needed for each operation. This will help ensure that production orders are completed in a timely manner and that all necessary resources and materials are available when needed. Additionally, it is important to consider how often production orders will need to be scheduled in order to ensure that all operations are completed on time. 
    
    Related Information: 
    For more information on SAP Production Planning and Control (PP), please refer to SAP’s official documentation at https://help.sap.com/viewer/product/SAP_PP/en-US. Additionally, there are many online tutorials available that provide step-by-step instructions on how to use the Work Scheduler Group in SAP PP.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant