What is secondary BOM in SAP PP - Production Planning and Control?


SAP Term: secondary BOM


Smart SAP Assistant

  • Key Concepts: 
    A Secondary BOM (Bill of Materials) is a type of BOM used in the Production Planning and Control (PP) component of SAP. It is used to define the components and sub-components of a product or assembly. It is also used to define the quantity of each component that is required for the production of the product or assembly. 
    
    How to use it: 
    The Secondary BOM can be created in the PP component of SAP by entering the components and sub-components of a product or assembly, as well as the quantity of each component that is required for production. The Secondary BOM can then be used to plan and control production processes, such as material requirements planning (MRP) and capacity requirements planning (CRP). 
    
    Tips & Tricks: 
    When creating a Secondary BOM, it is important to ensure that all components and sub-components are accurately entered, as well as the correct quantity of each component. This will ensure that production processes are planned and controlled correctly. 
    
    Related Information: 
    The Secondary BOM is closely related to other types of BOMs, such as the Master BOM and the Engineering BOM. The Master BOM is used to define the components and sub-components of a product or assembly, while the Engineering BOM is used to define the design specifications of a product or assembly.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant