Do you have any question about this SAP term?
Component: PP
Component Name: Production Planning and Control
Description: The overall capacity requirements generated by a work order or planned order.
Key Concepts: Planned capacity requirement is a term used in SAP Production Planning and Control (PP) to refer to the amount of capacity needed to produce a certain quantity of goods. It is calculated based on the production plan and takes into account the available resources, such as machines, personnel, and materials. The planned capacity requirement is used to determine the capacity needed for production and to plan for future capacity needs. How to use it: In SAP PP, the planned capacity requirement can be calculated by entering the production plan into the system. The system will then calculate the required capacity based on the available resources. This information can then be used to plan for future capacity needs and to ensure that there is enough capacity available for production. Tips & Tricks: When calculating the planned capacity requirement, it is important to consider all of the available resources, such as machines, personnel, and materials. This will ensure that the planned capacity requirement is accurate and that there is enough capacity available for production. Related Information: The planned capacity requirement is closely related to other terms in SAP PP, such as production order, material requirements planning (MRP), and capacity requirements planning (CRP). These terms are all used to plan for future production needs and ensure that there is enough capacity available for production.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP Glossary term explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |