Do you have any question about this SAP term?
Component: PP
Component Name: Production Planning and Control
Description: The person responsible for a group of materials in MRP in a plant or company. Material that takes part in material requirements planning must be assigned to an MRP controller.
Key Concepts: MRP controller is a role in SAP Production Planning and Control (PP) that is responsible for the planning and control of material requirements. The MRP controller is responsible for setting up and maintaining the master data for the materials, such as the material master, BOMs, and routing. They also monitor the material requirements planning (MRP) process and ensure that all materials are available when needed. How to use it: The MRP controller is responsible for setting up and maintaining the master data for the materials, such as the material master, BOMs, and routing. They also monitor the MRP process to ensure that all materials are available when needed. The MRP controller can also set up safety stocks to ensure that there is enough inventory on hand in case of unexpected demand or supply issues. Tips & Tricks: The MRP controller should be familiar with the different types of MRP runs available in SAP PP, such as net change planning, reorder point planning, and lot-for-lot planning. They should also be familiar with the different types of stock levels that can be set up in SAP PP, such as safety stock levels, minimum order quantities, and maximum order quantities. Related Information: The MRP controller should be familiar with other related SAP PP processes such as capacity planning, material requirements planning (MRP), and production scheduling. They should also be familiar with other related SAP modules such as Materials Management (MM) and Warehouse Management (WM).