1. SAP Glossary
  2. Production Orders
  3. original batch


What is original batch in SAP PP-SFC - Production Orders?


SAP Term: original batch

  • Component: PP-SFC

  • Component Name: Production Orders

  • Description: Batch that you create directly for a manufacturing or purchase order item and with which you can thus record the original properties characteristics of a production or procurement lot.


Smart SAP Assistant

  • Key Concepts: 
    Original batch is a term used in the SAP PP-SFC Production Orders component. It refers to the batch that is used as the basis for creating a production order. This batch is used to determine the material requirements for the production order, as well as the quantity of material that needs to be produced. 
    
    How to use it: 
    When creating a production order, the original batch must be specified. This can be done by entering the batch number in the “Original Batch” field of the production order. Once this is done, the material requirements and quantity of material to be produced will be determined based on this original batch. 
    
    Tips & Tricks: 
    It is important to ensure that the correct original batch is specified when creating a production order. If an incorrect batch is specified, it could lead to incorrect material requirements and quantity of material being produced. 
    
    Related Information: 
    For more information on original batches in SAP PP-SFC Production Orders, please refer to SAP Help documentation.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author