Do you have any question about this SAP term?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Component: PP-REM
Component Name: Repetitive Manufacturing
Description: A pull list determines which components a production line needs and when and where these components must be available. The quantities in the list are the result of a comparison between requirements and stock available at a production storage location. The pull list can be used to pull the required quantities from the distribution center.
Key Concepts: Pull list is a term used in SAP's PP-REM Repetitive Manufacturing component. It is a list of materials that are required for the production of a certain product. The list is generated based on the production order and the bill of materials (BOM) associated with it. The pull list is used to ensure that all the necessary materials are available for production. How to use it: In order to generate a pull list, the user must first create a production order in SAP. Once the production order is created, the user can then access the BOM associated with it and generate a pull list. The pull list will contain all the materials required for the production of the product. Tips & Tricks: When generating a pull list, it is important to double-check that all the necessary materials are included in the list. This can be done by comparing the BOM with the pull list and ensuring that all items are present. Additionally, it is important to check that all quantities are correct and that no items have been omitted from the list. Related Information: The pull list is an important part of SAP's PP-REM Repetitive Manufacturing component. It ensures that all necessary materials are available for production and helps to streamline the manufacturing process. Additionally, it can be used to track inventory levels and ensure that there are no shortages or excesses of materials.