Do you have any question about this SAP term?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Component: PP-PMR
Component Name: Predictive MRP
Description: Defines a material on the highest level in a multilevel bill-of-material multilevel BOM.
Key Concepts: Top-level material is a term used in the Predictive MRP (PP-PMR) component of SAP. It refers to the highest level of material in the bill of materials (BOM) hierarchy. It is the parent material that contains all the components and sub-assemblies that make up the finished product. How to use it: The top-level material is used to define the production process and to calculate the necessary resources for production. It is also used to determine the availability of components and sub-assemblies for production. The top-level material can be used to create a master production schedule, which is then used to plan and control production. Tips & Tricks: When creating a top-level material, it is important to ensure that all components and sub-assemblies are correctly specified in the BOM hierarchy. This will ensure that all necessary resources are available for production and that the master production schedule is accurate. Related Information: The PP-PMR Predictive MRP component of SAP also includes other features such as demand forecasting, inventory optimization, and capacity planning. These features can be used in conjunction with the top-level material to ensure efficient and effective production planning and control.