What is top-level material in SAP PP-PMR - Predictive MRP?


SAP Term: top-level material

  • Component: PP-PMR

  • Component Name: Predictive MRP

  • Description: Defines a material on the highest level in a multilevel bill-of-material multilevel BOM.


Smart SAP Assistant

  • Key Concepts: 
    Top-level material is a term used in the Predictive MRP (PP-PMR) component of SAP. It refers to the highest level of material in the bill of materials (BOM) hierarchy. It is the parent material that contains all the components and sub-assemblies that make up the finished product. 
    
    How to use it: 
    The top-level material is used to define the production process and to calculate the necessary resources for production. It is also used to determine the availability of components and sub-assemblies for production. The top-level material can be used to create a master production schedule, which is then used to plan and control production. 
    
    Tips & Tricks: 
    When creating a top-level material, it is important to ensure that all components and sub-assemblies are correctly specified in the BOM hierarchy. This will ensure that all necessary resources are available for production and that the master production schedule is accurate. 
    
    Related Information: 
    The PP-PMR Predictive MRP component of SAP also includes other features such as demand forecasting, inventory optimization, and capacity planning. These features can be used in conjunction with the top-level material to ensure efficient and effective production planning and control.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author