Do you have any question about this SAP term?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Component: PP-PEO
Component Name: Production Engineering and Operations
Description: An MBOM manufacturing bill of material that is not assigned to a manufacturing change record.
Key Concepts: Unassigned MBOM stands for Unassigned Material Bill of Materials. It is a type of bill of materials (BOM) used in the Production Engineering and Operations (PP-PEO) component of SAP. It is used to define the components and materials needed to produce a product, as well as the quantity and sequence of operations required to assemble the product. How to use it: The Unassigned MBOM is used to define the components and materials needed to produce a product, as well as the quantity and sequence of operations required to assemble the product. It can be used to create a BOM for a new product or modify an existing BOM. The Unassigned MBOM can also be used to define alternative production methods for a product, such as different assembly sequences or different materials. Tips & Tricks: When creating an Unassigned MBOM, it is important to ensure that all components and materials are correctly specified. This includes specifying the correct quantity and sequence of operations required for assembly. Additionally, it is important to ensure that all alternative production methods are correctly specified in order to ensure that the most efficient production method is chosen. Related Information: For more information on Unassigned MBOMs, please refer to SAP's official documentation on Production Engineering and Operations (PP-PEO). Additionally, there are many online resources available which provide detailed tutorials on how to create and modify Unassigned MBOMs in SAP.