Do you have any question about this SAP term?
Component: PP-PEO
Component Name: Production Engineering and Operations
Description: Provides a way to group the objects that need to be changed within the context of the change trigger for example, a new EBOM version, orchestrate the changes between different users and user groups, and manage the overall status of the change process.
Key Concepts: A Manufacturing Change Record (MCR) is a document used in SAP PP-PEO Production Engineering and Operations to track changes made to a manufacturing process. It is used to document the changes made, the reasons for the changes, and the effects of the changes. The MCR also serves as a reference for future changes and can be used to compare different versions of the same process. How to use it: To create an MCR, first select the “Manufacturing Change Record” option from the SAP PP-PEO Production Engineering and Operations menu. Then enter the details of the change, including the reason for the change, the effects of the change, and any other relevant information. Once all of the information has been entered, save the MCR and it will be available for future reference. Tips & Tricks: When creating an MCR, it is important to include as much detail as possible. This will ensure that all relevant information is captured and can be used for future reference. Additionally, it is important to keep track of all changes made to a process so that they can be compared against each other. Related Information: The Manufacturing Change Record is part of SAP PP-PEO Production Engineering and Operations. It is related to other features such as Process Control, Quality Control, and Process Simulation. Additionally, it can be used in conjunction with other SAP modules such as Materials Management and Plant Maintenance.