Do you have any question about this SAP term?
Component: PP-PEO
Component Name: Production Engineering and Operations
Description: An app in SAP S/4HANA that enables the production engineer in discrete manufacturing to create a simplified routing for planning purposes. The planning routing is used for material requirements planning to ensure that all components are available by the time that the shop floor routing is released and ready for production.
Key Concepts: Manage Planning Routings is a component of SAP Production Engineering and Operations (PP-PEO). It enables users to plan and manage production routings, which are the steps and processes that are required to produce a product. This includes the sequence of operations, the resources needed, and the estimated time for each operation. How to use it: Manage Planning Routings can be used to create and maintain production routings. This includes defining the sequence of operations, assigning resources, and estimating the time for each operation. The component also allows users to view and analyze existing production routings, as well as simulate changes to them. Tips & Tricks: When creating a new production routing, it is important to consider the resources that will be needed for each operation. This includes both human resources and materials. Additionally, it is important to consider the estimated time for each operation in order to ensure that the production process is efficient. Related Information: Manage Planning Routings is part of SAP Production Engineering and Operations (PP-PEO). Other components of PP-PEO include Manage Production Orders, Manage Quality Control, and Manage Maintenance. Additionally, Manage Planning Routings can be used in conjunction with other SAP components such as Materials Management (MM) and Plant Maintenance (PM).