Component: PP-PEO
Component Name: Production Engineering and Operations
Description: Enables labor tracking for an operation activity after it has been paused. When you start an operation activity at a work center for which labor tracking was enabled, the system tracks the time you are logged on working on the operation activity at that work center. If you pause the activity, labor tracking is automatically stopped.
Key Concepts: Labor on is a term used in the Production Engineering and Operations (PP-PEO) component of SAP. It refers to the amount of labor required to complete a production order. This includes the time needed for setup, production, and any other activities related to the order. Labor on is an important factor in determining the cost of a production order. How to use it: In SAP, labor on is calculated by taking into account the number of workers needed to complete the order, the time required for each worker, and any additional costs associated with the order. The labor on cost can then be used to determine the total cost of the production order. Tips & Tricks: When calculating labor on costs, it is important to consider any additional costs associated with the order such as materials, overhead, and other expenses. Additionally, it is important to factor in any overtime or shift premiums that may be applicable. Related Information: Labor on is just one of many factors that must be taken into account when calculating the cost of a production order in SAP. Other factors include materials, overhead, and other expenses. Additionally, it is important to consider any applicable taxes or fees that may be associated with the order.