Component: PP-PEO
Component Name: Production Engineering and Operations
Description: An app in SAP S/4HANA that allows you to display an as-built report for assemblies based on a production order or a material and serial number combination. The as-built report is multilevel, which means you can drill down into subassemblies of a parent assembly. For each material, you see key data such as serial number, batch, planned and consumed quantity, unit, assembly type, order number, and WBS element.
Key Concepts: An As-Built Report is a document used in the Production Engineering and Operations (PP-PEO) component of SAP. It is used to document the actual configuration of a system or process, and is typically created after the system or process has been built or modified. It includes details such as the components used, the settings used, and any other relevant information. How to use it: An As-Built Report can be created in SAP by navigating to the PP-PEO component and selecting the “Create As-Built Report” option. This will open a form where you can enter all of the relevant information about the system or process. Once you have entered all of the necessary information, you can save the report and it will be available for future reference. Tips & Tricks: When creating an As-Built Report, it is important to be as detailed as possible. This will ensure that all of the necessary information is included in the report and that it can be used for future reference. Additionally, it is important to keep the report up to date as changes are made to the system or process. Related Information: The As-Built Report is closely related to other documents such as Design Specifications and Change Requests. Design Specifications are documents that outline how a system or process should be built or modified, while Change Requests are documents that outline changes that need to be made to an existing system or process. All of these documents should be kept up to date in order to ensure that any changes are properly documented.