Do you have any question about this SAP term?
Component: PP-MRP
Component Name: Material Requirements Planning
Description: The lowest level that a material appears in a product structure.
Key Concepts: Low-level code is a term used in SAP's Material Requirements Planning (MRP) component. It is a numerical value assigned to each material that is used to determine the order in which materials are planned and produced. The lower the number, the higher the priority of the material. How to use it: Low-level codes are used to prioritize materials in MRP. When creating a production plan, the system will look at the low-level codes of all materials and prioritize them accordingly. This ensures that materials with higher priority are produced first. Tips & Tricks: When assigning low-level codes, it is important to consider the impact of each material on the overall production plan. Materials with higher priority should be assigned lower numbers, while those with lower priority should be assigned higher numbers. Related Information: Low-level codes are just one of many tools available in SAP's MRP component. Other tools include safety stock levels, reorder points, and lot sizing methods. All of these tools can be used together to create an effective production plan.