Do you have any question about this SAP term?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Component: PP-MRP
Component Name: Material Requirements Planning
Description: The criterion that groups together all checking rules for all application areas for a material. In conjunction with the checking rule, the checking group defines the scope of the availability check for each business event, that is, which stocks, goods receipts, and goods issues are taken into account in the availability check, and whether replenishment lead time is checked.
Key Concepts: A checking group is a feature of SAP's Material Requirements Planning (MRP) component. It is used to group materials together for the purpose of MRP calculations. The checking group is used to determine which materials are affected by a particular MRP run. It can also be used to limit the scope of an MRP run, so that only certain materials are included in the calculation. How to use it: The checking group is set up in the material master record. It can be assigned to a material or a group of materials. When an MRP run is executed, the system will check the checking group assigned to each material and determine whether or not it should be included in the calculation. If the material has a checking group assigned, it will be included in the calculation; if not, it will be excluded. Tips & Tricks: When setting up a checking group, it is important to consider how it will affect the MRP run. For example, if you want to limit the scope of an MRP run to certain materials, you should assign those materials to a checking group and then use that checking group when running the MRP. This will ensure that only those materials are included in the calculation. Related Information: For more information on setting up and using checking groups in SAP's Material Requirements Planning component, please refer to SAP's online help documentation or contact your local SAP support team.