Component: PP-FLW
Component Name: Flow Manufacturing
Description: A control parameter for takt-based scheduling in sequencing. The planned rate is the quantity for each time unit that you can produce for a specific period on a production line.
Key Concepts: Planned rate is a term used in SAP PP-FLW Flow Manufacturing. It is the rate at which a production order is planned to be completed. This rate is determined by the production order's planned quantity and duration. The planned rate is used to calculate the total cost of the production order. How to use it: In SAP PP-FLW Flow Manufacturing, the planned rate can be set when creating a production order. The planned rate can be adjusted at any time during the production process. The planned rate can also be used to calculate the total cost of the production order. Tips & Tricks: When setting the planned rate for a production order, it is important to consider the resources that will be needed to complete the order. This will help ensure that the planned rate is accurate and that the total cost of the production order is accurate. Related Information: The planned rate is related to other terms in SAP PP-FLW Flow Manufacturing such as actual rate, standard rate, and estimated rate. The actual rate is the actual rate at which a production order was completed, while the standard rate is the expected rate at which a production order should be completed. The estimated rate is an estimate of how long it will take to complete a production order.