Do you have any question about this SAP term?
Component: PP-DD
Component Name: Demand-Driven Replenishment
Description: A factor that is part of a buffer profile and that helps define the buffer levels for a group of products based on their decoupled lead time classification.
Key Concepts: Lead time factor is a parameter used in the Demand-Driven Replenishment (PP-DD) component of SAP. It is used to calculate the safety stock for a material based on the lead time of the material. The lead time factor is calculated by dividing the lead time of the material by the average lead time of all materials in the system. How to use it: The lead time factor can be set up in the PP-DD component of SAP. To do this, go to the “Material Master” view and select “Lead Time Factor” from the drop-down menu. Enter the lead time for each material and then click “Save”. The system will then calculate the lead time factor for each material based on its lead time and the average lead time of all materials in the system. Tips & Tricks: It is important to ensure that the lead times for each material are accurate, as this will affect the accuracy of the lead time factor calculation. Additionally, it is important to keep an eye on changes in lead times, as this can affect safety stock calculations and inventory levels. Related Information: For more information on setting up and using the lead time factor in SAP, please refer to SAP Help documentation or contact your local SAP support team.