Do you have any question about this SAP term?
Component: PP-BD
Component Name: Basic Data
Description: A reference operation set or reference rate routing used as a reference in the Engineering Workbench. The reference operation is visible when the operations for the referenced routings are hidden, that is, when the referenced routing is "collapsed."
Key Concepts: A dummy operation is a type of operation in the Production Planning (PP) module of SAP. It is used to represent a non-productive activity in the production process, such as a quality check or a machine setup. It does not consume any materials or generate any output. How to use it: In order to create a dummy operation, you must first create a routing in the PP-BD Basic Data component. Once the routing is created, you can add the dummy operation to it. To do this, select the “Create Operation” button and then select “Dummy Operation” from the drop-down menu. You can then enter the details of the dummy operation, such as its description and duration. Tips & Tricks: When creating a dummy operation, make sure to enter an accurate duration for it. This will ensure that the production process is accurately represented in the system. Additionally, you should also make sure to assign an appropriate cost center to the dummy operation so that it can be tracked and monitored properly. Related Information: For more information on dummy operations in SAP, please refer to the official SAP documentation on PP-BD Basic Data. Additionally, there are many online tutorials and videos available that provide step-by-step instructions on how to create and manage dummy operations in SAP.