1. SAP Glossary
  2. Recipe Management
  3. alternative material


What is alternative material in SAP PLM-RM - Recipe Management?


SAP Term: alternative material

  • Component: PLM-RM

  • Component Name: Recipe Management

  • Description: Material that represents an entire product group or product hierarchy. When carrying out trials, there is not always an inspection plan available for the product to be manufactured: In some cases, it only exists for a whole product group or product category in the product hierarchy. In inspection planning in Trial Management, the system checks whether an inspection plan exists for the specified material. If no inspection plan exists, the system searches for an alternative material. You can then carry out inspection planning for the trial based on the alternative material and its inspection plan.


Smart SAP Assistant

  • Key Concepts: 
    Alternative material is a feature of SAP's Recipe Management component of the Product Lifecycle Management (PLM) suite. It allows users to substitute one material for another in a recipe, while still maintaining the same quality and quantity of the original material. This feature is useful for companies that need to adjust their recipes due to changes in availability or cost of materials. 
    
    How to use it: 
    To use alternative material, users must first create a recipe in the Recipe Management component. Once the recipe is created, users can add alternative materials to the recipe by selecting the “Add Alternative Material” option from the menu. This will open a window where users can select an alternative material from a list of available materials. Once selected, the alternative material will be added to the recipe and can be used in place of the original material. 
    
    Tips & Tricks: 
    When adding an alternative material to a recipe, it is important to make sure that the quantity and quality of the new material matches that of the original material. This will ensure that the recipe produces consistent results regardless of which material is used. Additionally, it is important to keep track of which materials are used in each recipe so that they can be easily identified and replaced if needed. 
    
    Related Information: 
    For more information on using alternative materials in SAP's Recipe Management component, please refer to SAP's official documentation on Recipe Management. Additionally, there are many online tutorials and videos available that provide step-by-step instructions on how to use this feature.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker