1. SAP Glossary
  2. Product Lifecycle Costing
  3. engineering change number


What is engineering change number in SAP PLM-PLC - Product Lifecycle Costing?


SAP Term: engineering change number

  • Component: PLM-PLC

  • Component Name: Product Lifecycle Costing

  • Description: A number used to uniquely identify a change master record in SAP ERP. All changes made with reference to a change number are controlled and logged by the change master record in SAP ERP.


Smart SAP Assistant

  • Key Concepts: 
    Engineering Change Number (ECN) is a unique identifier used in SAP Product Lifecycle Costing (PLM-PLC) to track changes made to a product or process. It is used to document and manage the changes that occur during the product lifecycle, from design to production. The ECN is assigned to each change and is used to track the progress of the change throughout the product lifecycle.
    
    How to use it: 
    The ECN is used to document and manage changes made to a product or process. It is assigned to each change and is used to track the progress of the change throughout the product lifecycle. The ECN can be used to identify which changes have been made, when they were made, and who made them. It can also be used to track the cost of making the changes and any other related information.
    
    Tips & Tricks: 
    When creating an ECN, it is important to ensure that all relevant information is included. This includes details such as the date of the change, who made it, what was changed, why it was changed, and any other related information. Additionally, it is important to ensure that all changes are documented accurately and that all stakeholders are aware of any changes that have been made.
    
    Related Information: 
    The ECN is part of SAP Product Lifecycle Costing (PLM-PLC). It can be used in conjunction with other tools such as SAP Change Management (CM) and SAP Quality Management (QM) to ensure that all changes are tracked and managed effectively throughout the product lifecycle. Additionally, it can be used in conjunction with other SAP modules such as SAP Materials Management (MM) and SAP Production Planning (PP) for more detailed tracking of costs associated with changes.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker