Do you have any question about this SAP term?
Component: MFG-PCO
Component Name: Plant Connectivity
Description: A time interval in which all individual messages, which have accumulated within a notification for a specific destination system, are grouped together into one notification message.
Key Concepts: Accumulation time is a feature of the MFG-PCO Plant Connectivity component of SAP. It is used to define the time period in which production orders are accumulated and sent to the plant. This allows for more efficient production planning and scheduling. How to use it: Accumulation time can be set up in the SAP system by going to the MFG-PCO Plant Connectivity component and selecting the “Accumulation Time” option. From there, you can set the desired accumulation time period. This can be done on a daily, weekly, or monthly basis. Tips & Tricks: It is important to consider the production cycle when setting up accumulation time. If the production cycle is too short, then it may not be possible to accumulate orders within the desired time period. It is also important to consider any external factors that may affect production, such as supplier delays or seasonal demand fluctuations. Related Information: Accumulation time is closely related to other features of MFG-PCO Plant Connectivity, such as order release and order confirmation. It is also related to other SAP components, such as Production Planning and Scheduling (PP/DS) and Manufacturing Execution (ME).