Do you have any question about this SAP term?
Component: MFG-LPO
Component Name: SAP Lean Planning and Operations (SAP LPO)
Description: The minimum amount of time required to produce material. Run time does not include setup time.
Key Concepts: Minimum run time is a feature of SAP Lean Planning and Operations (SAP LPO) that allows users to set a minimum amount of time for a production run. This ensures that the production run is completed within the specified time frame, allowing for more efficient planning and operations. How to use it: To use the minimum run time feature, users must first set the minimum amount of time for a production run. This can be done in the SAP LPO system by selecting the “Minimum Run Time” option from the menu. Once this is done, users can then enter the desired amount of time for the production run. Tips & Tricks: When setting the minimum run time, it is important to consider the size and complexity of the production run. If the production run is large or complex, it may require more time than what is specified in the minimum run time setting. It is also important to consider any potential delays or disruptions that may occur during the production run. Related Information: The minimum run time feature is part of SAP Lean Planning and Operations (SAP LPO). Other features of SAP LPO include demand forecasting, inventory optimization, and supply chain visibility. Additionally, SAP LPO can be integrated with other SAP systems such as SAP ERP and SAP SCM.