1. SAP Glossary
  2. SAP Complex Assembly Manufacturing
  3. precedence


What is 'precedence' in SAP MFG-CAM - SAP Complex Assembly Manufacturing?


precedence - Overview


precedence - Details


  • Key Concepts: Precedence is a concept used in MFG-CAM SAP Complex Assembly Manufacturing to define the order in which operations are performed. It is used to determine the sequence of operations that must be completed in order to produce a finished product. Precedence can be used to define the order of operations, the number of times an operation must be performed, and the resources required for each operation.
    How to use it: Precedence can be used to define the order of operations in a complex assembly manufacturing process. This can be done by assigning a numerical value to each operation, with higher numbers indicating higher precedence. The operations are then performed in order from highest precedence to lowest precedence. Additionally, precedence can be used to define the number of times an operation must be performed and the resources required for each operation.
    Tips & Tricks: When setting up precedence for a complex assembly manufacturing process, it is important to consider the resources available and the time required for each operation. This will help ensure that all operations are completed in the most efficient manner possible. Additionally, it is important to consider any dependencies between operations when setting up precedence.
    Related Information: For more information on precedence and how it is used in MFG-CAM SAP Complex Assembly Manufacturing, please refer to SAP’s documentation on the topic.

    Already have an account? Login here!





precedence - Related SAP Terms

Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker